The Challenges

Cement plant with a clinker capacity of 600,000 MTS per annum was commissioned in 1983 and subsequently due to increase demand for the cement in the region.
Task: 3.8 km long conveyor which is used to convey limestone from crusher to silo uses steel cord belt ST 630, 1000mm Wide was through cut at around 6 meters.
Solution: FaBa arranged inspection to monitor health of the belt and bring out the best solution and cut the full damage belt and did Hot Vulcanizing joint on the same belt including splicing kit. Completed work within 15 hrs.