The Challenges

Ready mix company has consistently delivered impeccable quality in products and services throughout the Gulf Region. Originally established in 1984, Has now grown to extend full operations across an extended network throughout Oman with annual production capacities yielding 10 million concrete blocks, 1.2 million square meters of interlocking tiles, and 2.7 million linear meters of kerbstones.
Task:
Conveyor belt 800mm wide, EP400/4 ply, 4+2mm Cover rubber  has cut in middle of length and emergency call received for the Job
Solution:
Mobilized team from Sohar to Muscat within 3 hours with supply of belt, installation of 37 meter Length and  joining.

Project Description