The Challenges

For the Qatar metro project  a station and two metro lines are made 40 meters below the ground. The materials from the pit and tunnels needed to be removed at a rate of 600 Tons/hour  and a  142 meter long conveyor system with hopper and feeder was designed / engineered, supplied, installed and commissioned by FaBa.

 

Project Description